Browse
Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs

Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs

by IWA Publishing

£145.00
MPN9781843397168
Prices updated 21 May 2026

Compare 1 Retailer

Prices checked 24d ago
TGJones logo

TGJones

BEST PRICE
In stock2 - 4 working days
3 deals available
£145.00
Best Price

Amazon

Check live price on Amazon.co.uk

eBay

Check availability and price on eBay.co.uk. Yorkshire.com may be paid for purchases made through this link, by eBay Partner Network.

Check on eBay

Can’t find it elsewhere?

Product Description

Over the past 20 years, the use of Best Management Practices (BMPs) in the United States has been instrumental in reducing both the detrimental impacts to receiving water quality and the exacerbated flooding caused by urbanization and storm water drainage.More recently, Sustainable Urban Drainage Systems (SUDS) have started to be used in the United Kingdom.Both SUDS and BMPs attempt to mimic the drainage patterns of the natural watershed, and can also provide a degree of treatment needed to improve the quality of the water discharged to an acceptable level.The costs of conventional stormwater collection systems are determined primarily in terms of initial capital expenditure.Long-term maintenance costs are absorbed by stormwater authorities that are responsible for maintaining their infrastructure as part of their "asset base".Currently, only a few of these responsibilities exist for BMPs and SUDS, which generally incorporate surface components and are often dependent on landscaping rather than on traditional construction techniques, but may require significant regular maintenance.Any potential adopting organization will require guidance on the maintenance regimes of different types of systems and how such regimes translate into long-term adoption costs.The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the US and UK to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance.As part of Phase 2, the operation of selected BMPs and SUDS will be monitored over a one-year period in terms of pollutant removal and hydrologic/hydraulic efficiency, and applicability of their design criteria and maintenance regime.The protocols developed in Phase 1 will be used to assess BMPs/SUDS performance and whole-life costs.

More products from TGJones

Browse their full range on Yorkshire.com

From£145.00TGJones
Buy Now